Global Journal of Management and Business Research, A: Administration and Management, Volume 23 Issue 10

Engineering), Federal Technological University of Paraná, Ponta Grossa. 5. Bruin, T., Rosemann, M., Freeze, R. and Kaulkarni, U., (2005), Understanding the main phases of developing a maturity assessment model. In Bunker, D., Campbell, B., and Underwood, J. (Eds.) Australasian Conference on Information Systems (ACIS). Australasian Chapter of the Asso- ciation for Information Systems, pp. 8-19. Available at: https://eprints.qut.edu.au/25152/. 6. Chiroli, D. M. D. G., Solek, É. A., Oliveira, R. S., Barboza, B. M., Campos, R. P. D., Kovaleski, J. L., ... & Trojan, F. (2022). Using multi-criteria analysis for smart city assessment. Cidades. Comunidades e Territórios, (44). 7. Chen, C. T. (2000), Extensions of the TOPSIS for group decision making under fuzzy environment, Fuzzy Sets and Systems , Vol. 114, No. 1, pp. 1-9. DOI: 10.1016/S0165-0114(97)00377. 8. Chen, C. T., Lin, C. T. and Huang, S. F. (2006), A fuzzy approach for supplier evaluation and selection in supply chain management, International Journal of Production Economics , Vol. 102, No. 2, pp. 289– 301. DOI: 10.1016/j.ijpe.2005.03.009. 9. Cook, R.L. (1992), Expert systems in purchasing: applications and development. International Journal of Purchasing and Materials Management , Vol. 28, No.4, pp. 20-27. Doi: 10.1111 /j.1745-493X.1992.tb 00577.x. 10. De Boer, F., Müller, C., and ten Caten, C. (2015). Assessment model for organizational business process maturity with a focus on BPM governance practices, Business Process Management Journal , Vol. 21, No. 4, pp. 908-927. Doi: 10.1108/BPMJ-11- 2014-0109. 11. Dijkman, R., Lammers, S. and de Jong, A., (2015), Properties that influence business process management maturity and its effect on organi- zational performance. Information Systems Frontiers , Vol. 18 No. 4, pp. 717-734. Doi: 10.1007/s10796- 015-9554-5. 12. Froger, M., Bénaben, F., Truptil, S. and Boissel- Dallier, N. (2019), A non-linear business process management maturity framework to apprehend future challenges. International Journal of Information Management, Vol.49, pp. 290-300. doi: 10.1016/j. ijinfomgt.2019.05.013 13. Hammer, M., (2007), The process audit. Harvard Business, Vol. 4, pp. 111-123. Available at: http:// modir3-3.ir/article-english/article330.pdf (accessed 6 february 2020). 14. Lima, E., Viegas, R. and Costa, A., (2017), A multicriteria method based approach to the BPMM selection problem. 2017 IEEE International Conference on Systems, Man, and Cybernetics, pp. 3334-3339. Doi: 10.1109/SMC.2017.8123144. 15. Mahendrawathi, E. R., Hanggara, B. T. B. T. and Astuti, H. M. H. M., (2019), Model for BPM imple- mentation assessment: evidence from companies in Indonesia, Business Process Management Journal , Vol. 25 No. 5, pp. 825-859, 2019. Doi: 10.1108/BPMJ-08-2016-0160. 16. Mello, V. G. D., Kovaleski, J. L., Zola, F. C., Lima Junior, F. R., Aragão, F. V., & Chiroli, D. M. D. G. (2022). Proposal of a Fuzzy-QFD model for startup selection. Technology Analysis & Strategic Management, 1-16. 17. Röglinger, M., Pöppelbuß, J. and Becker, J., (2012), Maturity models in business process management, Business Process Management Journal, Vol.18, No. 2, pp. 328-346. Doi: 10.1108/14637151211225225. 18. Rosemann, M. and Bruin, T., (2005), Towards a business process managment maturity. ECIS 2005 Proceedings of the Thirteenth European Conference on Information Systems . Germany, Regensburg. Available at: thttp://citeseerx.ist.psu.edu/ viewdoc/ download?doi=10.1.1.425.681&rep=rep1&type=p df. 19. Saaty, T. L. (1980), the analytic hierarchy process , McGraw-Hill, New York. 20. Saaty, T. L. (1994), Fundamentals of decision making , RWS Publications, Pittsburgh. 21. Serrano, M. D., Peral, F.J.B., Casas, F. M. G. and Lozano, M. G. (2011) , Una revisión crítica para la construcción de indicadores sintéticos, Revista de Métodos Cuantitativos para la Economia y la Empresa , Vol. 11, pp. 41-70. Available at: https:// www.econstor.eu/bitstream/10419/59089/1/6840254 26.pdf. 22. Soares, A. M., Kovaleski, J. L., Gaia, S., & Chiroli, D. M. D. G. (2020). Building sustainable development through technology transfer offices: An approach based on levels of maturity. Sustainability, 12 (5), 1795. 23. Tan, Y., Shen, L., Langston, C. and Liu, Y. (2010), Construction Project selection usign fuzzy TOPSIS approach, Journal of Modeling in Management , Vol. 5, No. 3, pp. 302-315. Doi: 10.1108/174656610110 92669 24. Tarhan, A., Turetken, O. and Ilisulu, F.(2015), Business process maturity assessment: state of the art and key characteristics, Proceedings - 41st Euromicro Conference on Software Engineering and Advanced Applications , pp. 430-437. Doi: 10.1109/ SEAA.2015.50. 25. Tarhan, A., Turetken, O. and Reijers, H. (2016), Business process maturity models: a systematic literature review, Information and Software Technology , Vol. 75, pp. 122-134. Doi: 10.1016/j. infsof.2016.01.010 26. van Looy, A., de Backer, M., Poels, G. and Snoeck, M. (2013), Choosing the right business process Innovative Multicriteria Approach to Business Process Management Maturity in the Public Sector Global Journal of Management and Business Research ( A ) XXIII Issue X Version I Year 2023 67 © 2023 Global Journals

RkJQdWJsaXNoZXIy NTg4NDg=