Global Journal of Management and Business Research, F: Real Estate, Event and Tourism Management, Volume 23 Issue 3

Sufficient Storage Space 90% 80% 70% 60% 50% 40% 30% Strongly Agree(%) Strongly Disagree(%) Agree(%) Disagree(%) RNPP DMR GWTP MUSCCFPP DCRP From the questionnaire survey in those five projects, we found that almost all projects have challenges in the efficient materials procurement process where the project RNPP, DCRP, and GWTP have to face most challenges for tight schedules, unavailability of materials, and also this type of project is new in Bangladesh. b) Sufficient Storage Space In an international project, several companies work together and no company can take the place of the office, warehouse, labor shade, and other’s facilities as their wish. Generally, the main contractor of the project supervised this which means they fix the space for a fixed company. Every company has to take the approval of the main contractor and make the all infrastructure especially the warehouse by following proper safety rules and guidelines. Not only this, many times may have to move the warehouse and materials after building and storing them for different causes. So, the inventory management personnel have to face the problem of the lack of materials storage space. However, the lack of proper knowledge of the size of materials, and materials delivery schedule, the store personnel have no preparation of storage space. If the goods are not sent when they are needed, there is a shortage of storage space. Fig. 02: Sufficient Storage Space Challenges From the questionnaire survey in those five projects, we found that almost all projects have challenges in sufficient storage space where the project RNPP and DMR have to face the most challenges c) Tracking of Materials Accurately Inventory tracking denotes the stock level, stock location, inventory accuracy, inventory turnover, reorder level, stock of damaged goods, return goods, and stock value. In a construction project, it is challenging to track materials accurately because of different types, sizes, brands, codes, colors, grades, the origin of the same goods, moving materials from one location to another continually, lack of enough warehouse, stocking materials in different places, storage materials under the sky, taking away the goods by the user without informing to the store department, especially which materials are kept in open space, due to correct writing of all product information in the issue slip and as a result the wrong entry in the software, etc. By questionnaire survey, I found that the following goods are most challenging to track accurately. 1. Bricks 2. Stone 3. Sand 4. Rebar 5. Hardware goods Inventory Management Practices and Challenges in Mega Construction Projects in Bangladesh Global Journal of Management and Business Research ( F ) XXIII Issue III Version I Year 2023 25 © 2023 Global Journals

RkJQdWJsaXNoZXIy NTg4NDg=